A fabrication workshop, Leicester

Industrial · 189 kWp · December 2024

What was there

A busy metal fabrication workshop with a big, clear industrial roof and machinery running all day. Exactly the kind of building where solar earns its keep.

What we did

We filled the roof with 189 kWp of panels on a SolarEdge system, with the network operator's approval in place first.

How it's doing

Switched on in December 2024. In the 12 months to 30 September 2026 the roof made 171.6 MWh. The building used 66% of that on site, and solar covered 38% of all the electricity it used.

189 kWp
our biggest single roof so far
66%
of the solar used on site over 12 months
Dec 2024
switched on
38%
of the building's electricity came from its own roof

Figures from the system's own monitoring, for 1 October 2025 to 30 September 2026.