A life sciences company in Wiltshire that wanted lower running costs and a smaller footprint, without any disruption to the lab.
A 121.73 kWp SolarEdge system on the roof, plus EV chargers for staff. Fitted and commissioned within a month, with the business carrying on as normal.
In 2024, its first full calendar year, it generated 102.4 MWh of electricity. It is still running today, and has saved 59 tonnes of CO₂ so far by SolarEdge's estimate.
Figures from the system's own monitoring. The 2024 figure covers 1 January to 31 December 2024. The CO₂ figure was read on 2 October 2026.
Send us a year of bills and we'll tell you honestly whether solar stacks up.
★★★★★ 5.0 from over 120 Google reviews →