Homes and businesses across Leicestershire and beyond. Every one surveyed and designed by us, with us on site running the install.
189 kWp across the roof, switched on in December 2024. Over its last 12 months, the building used 66% of what the roof made.
read the case study →17.5 kWp of all-black panels built flush into the workshop's new roof, with a Sigenergy battery.
read the case study →56.7 kWp on the barn roof with a battery, fitted around a working farm.
read the case study →154 panels, 65.5 kWp, fitted in 12 days to help power the showroom’s new EV chargers.
read the case study →121.73 kWp on a commercial unit, commissioned within a month without disrupting the business.
read the case study →14.7 kWp and a battery across a pitched and a flat roof, fitted in eight days while the business kept working.
read the case study →16.67 kWp split east-west on a new roof, fitted in five days for a restaurant that had gone all-electric.
read the case study →12.74 kWp of all-black panels on the barn roof, with an 18 kWh Sigenergy battery, backup gateway and EV charging at the house.
read the case study →8.55 kWp of all-black panels, 17.1 kWh of Sigenergy battery and an EV charger. It made 12% more than we estimated in its first year.
read the case study →4.9 kWp on one and 8.46 kWp on the other, each with its own SolarEdge battery.
read the case study →11.6 kWp of solar, a Sigenergy battery in the garage and a charger on the drive.
solar & batteries →12.8 kWp of ground-mounted panels and an 18 kWh battery.
more in the Charnwood villages →7.8 kWp on the roof and an 18 kWh battery, supervised throughout by the dog.
more in the Charnwood villages →15.4 kWp spread over the roofs. The chickens didn’t mind.
solar & batteries →14.4 kWp across the roofs, with 20 kWh of batteries and backup in the garage so the house keeps running in a power cut.
more in Rutland →An 18 kWh battery added to an older Feed-in Tariff array, with the FIT kept safe.
battery retrofits →A failed inverter isolated and a faulty RCD (safety trip switch) replaced, up in the bell tower.
solar repairs →
LED and feature lighting with sockets at every chair, in an exposed industrial finish.
see all the photos →Every one of these started with a free survey and a chat on the drive.
Book a free survey and we'll come and have a look.
★★★★★ 5.0 from over 120 Google reviews →